Fire Protection Upgrades

Keen partnered with a customer to enhance their fire protection system by constructing two new CMU buildings and completing extensive underground upgrades to the existing high-pressure fire main loop. Prior to construction, our team managed the demolition of an existing building and tank to prepare the site. This project required careful sequencing to minimize shutdowns and ensure the plant remained operational and safe. Keen coordinated a combination of our own subcontractors as well as owner subcontractors. Due to challenging site conditions, Keen provided a design-build Geopier Rammed Aggregate Pier® system. In addition, a flood control door and containment were added due to the site being located within floodplains.